Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi
Author
Lusiana
Additional Author(s)
Prasetya, Erich Hudi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011545/SIP/2007
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 50 - 109
Bibliography: p. 49
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 109 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03710/07
(T) - 692.5 Lus P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
A study on Richard Steele's the conscious lovers as a sentimental comedy
Sekolah seni anak-anak tuna daksa di Surabaya
Studi komparasi member card dan non member terhadap frekuensi belanja, tingkat pembelian dan loyalitas konsumen di indogrosir surabaya
Tingkat pengetahuan masyarakat Denpasar, Bali tentang program talk show "Ajeg Bali" Bali TV
Jenis pekerjaan yang mendominasi komposisi biaya pembangunan ruko
Studi kasus penerapan metode collapsed as-built terhadap sebuah bangunan perkuliahan di kota Surabaya
Showroom Interior Surabaya
Kecelakaan kerja pada pekerjaan beton bertulang akibat faktor manusia