Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Author
Japar, Nico
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041217/IND/2007
Subject(s)
MOTION STUDY
TIME STUDY
Notes
Appendix: p. 48 - 64
Bibliography: p. 47
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 64 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01639/08
(T) - 658.542 Jap M
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi deinking plant (DIP) PT. Suparma Tbk.
Penjadwalan jobshop di CV Sinar Indah Teknik
Perencanaan produksi di PT, "X"
Penentuan waktu baku dan analisa perhitungan tenaga kerja bagian paper machine 7 PT. Suparma Tbk Surabaya
Penentuan waktu standar dan rumusannya serta penerapan metode activity based costing di PT X
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi stock preparation 5 & 7 PT. Suparma Tbk
Rancangan perbaikan standar metode kerja berdasarkan micromotion study untuk mengurangi motion waste
Perbaikan metode kerja pada bagian pengemasan di PT. Kembang Bulan