Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Author
Japar, Nico
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041217/IND/2007
Subject(s)
MOTION STUDY
TIME STUDY
Notes
Appendix: p. 48 - 64
Bibliography: p. 47
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 64 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01639/08
(T) - 658.542 Jap M
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Sukses anda terletak pada putaran waktu
Perhitungan waktu baku dan optimalisasi kebutuhan tenaga kerja di PT Smart, Tbk.
Peningkatan kapasitas produksi di PT Wangta Agung I
Perbaikan durasi dan pemenuhan task list aktivitas weekly cleaning pada mesin maker di PT X
Upaya pengelolaan manajemen waktu kunjungan untuk menunjang pertumbuhan volume penjualan produk pakaian tidur di lima kantong pasar di Surabaya
LKP : proses produksi di PT Supra Aspindo Jaya
Pemilihan alternatif sistem penjadualan di PT Solihin Jaya
Motion and time study for lean manufacturing