Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi teknis pengoperasian diesel genset (PLTD) 3800 KVA di PT. Meranti Sakti Indah Plywood, Samarinda
Author
Thio, Nie Ming
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Elektro UK Petra , 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010528/ELK/2005
Subject(s)
DIESEL ELECTRIC POWER-PLANTS
ELECTRIC GENERATORS
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 109 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01929/06
(T) - 621.31213 Thi S
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Studi suplai listrik dengan sistem pembangkit hibrida yang terdiri dari solar photovoltaic, wind turbine generator, diesel engine generator 200 KWH/hari tegangan 220 volt AC di Nusa Penida
Pengaturan tegangan pada generator AC induksi 3 fasa 1,5 kw dengan zelio SR2B201 BD
Studi pengoperasian pembangkit listrik tenaga diesel (PLTD) di Kupang, NTT
Studi tentang pembagian beban pada generator set (2 x 1,25 mva) di Tunjungan Plaza II
Studi operasi dan kontrol dari tiga pembangkit di PT. Sasa Inti, Gending, Probolinggo
Perencanaan dan pembuatan active load balancing unit pada generator 3 fase, 220/380 V, 25 KVA, beban dibatasi 5 KW, unit diparalel dengan PLN
LKP : sistem pembangkitan di Mercure Grand Hotel Surabaya
LKP : PT Maspion Group Surabaya