Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : CV Sumber Baru Semarang
Author
Kusuma, Pranata
Additional Author(s)
-
Publisher
Surabaya: 1993
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek : Elektrik I
Subject(s)
ELECTRIC GENERATORS
ELECTRIC MOTORS, ALTERNATING CURRENT
ELECTRIC MOTORS, DIRECT CURRENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii,54p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05259/93
L 621.3 Kus L/E-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Sidokumpul Raya Gresik
Perencanaan dan pembuatan automatic voltage stabilizer 3 phasa (3x1000VA), 50 HZ, 220/380V menggunakan mikro kontroller 8031 dengan proteksi overload dan open phasaa
LKP : PT Agrindo
Studi tentang pengoperasian turbo generator 300 MW di PLTU Gresik
LKP : PT Pakuwon Jati Surabaya
Perancangan heat recovery steam generation untuk mengkombinasi PLTG dengan PLTU PT. Indonesia Power unit Perak
Studi kerja paralel generator secara otomatis serta mekanisme CB saat kerja paralel di PLTU sektor Gresik
Studi penggunaan permanen magnet servo motor tegangan 460 V DC, 1850 RPM pada mesin potong karton di PT. Purinusa Eka Persada