Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi pada CV. Naga Jaya Plastics di Surabaya
Author
Linggosahputra, Kurnia
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011065/IND/2006
Subject(s)
PRODUCTION SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01634/06
(T) - 658.53 Lin P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis tingkat rasio absensi dan keterlambatan terhadap pencapaian target produksi di PT Rimba Kencana, Banyuwangi
Perancangan ISO 9001:2008 di PT Sentosa Alloy Industri, Sidoarjo
Perancangan metode dan fasilitas kerja dengan pendekatan ergonomi pada Departemen SKT di PT HM Sampoerna
Analisa prosedur dan penerapan sistem manajemen mutu standar ISO 9001 di PT Domusindo Perdana
Penjadwalan perawatan peralatan di NGP Hotel, Surabaya
Perancangan desain PEFF dashboard untuk akurasi data actual working hour pada PT Toyota Motor Manufacturing Indonesia
LKP: penyusunan material requirement planning di PT Aditya Angkasa Rungkut
Scheduling construction projects