Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Sistem pengambilan keputusan bagi Kontraktor untuk mengikuti tender
Author
Abadi, Christi Dian
Additional Author(s)
Binaryadi, Edwin
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121466/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY
PROJECT MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 73 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01492/06
(T) - 658.404 Aba S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
A survey of progress characteristics of construction projects in Thailand and Indonesia
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Pengaruh komitmen top manajemen terhadap kinerja proyek melalui kemampuan tim proyek dan desain proyek
Analisa pengaruh peran top manajemen, supplier relationship, strategi purchasing, dan supply chain integration terhadap performa purchasing pada perusahaan konstruksi
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Harvard business review on managing projects
Antisipasi kontraktor menghadapi faktor-faktor resiko pada kontrak lumpsum (studi kasus pada perusahaan kontraktor PT Rancang Bangun Sarana)
Perbandingan PPC dan faktor-faktor yang mempengaruhi pada dua proyek apartemen