Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek Jemmy Vernatha, Shamgar Eldad
Author
Vernatha, Jemmy
Additional Author(s)
Eldad, Shamgar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012173/SIP/2017
Subject(s)
PROJECT MANAGEMENT
SCHEDULLING (MANAGEMENT)
Notes
Appendix: p. 49-53
. Bibliography: p. 47-48.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 53 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02791/17
(T) SIP 2173
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan dan pengendalian jadwal proyek dengan menggunakan metode CPM pada proyek apartemen
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Six sigma team dynamics
Project management
Sistem optimalisasi penjadwalan linear scheduling method pada proyek saluran irigasi
Project planning, scheduling, and control
Analisis hubungan kemitraan dalam mencapai kesuksesan proyek dengan metode sem
Analisa kepuasan pengembang terhadap kualitas konstruksi pada perumahan kelas menengah di Surabaya