Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Author
Yessianto, Fellix
Additional Author(s)
Tedjo, Heriyanto Kusuma
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301434/SIP/2005
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 124 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02870/05
(T) - 658.404 Yes I
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Construction methods and management
The structuring of build-operate-transfer construction projects
CPM in construction management
Strategi perusahaan konstruksi di Surabaya di era krisis
Studi kasus penjadwalan proyek pada proyek rumah toko X menggunakan microsoft project 2010
Pengaruh ketidakberaturan massa vertikal pada bangunan yang direncanakan secara direct displacement based design
Studi kasus penerapan metode collapsed as-built terhadap sebuah bangunan perkuliahan di kota Surabaya
The management of projects