Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pemodelan kendali sistem proses regenerasi bed active carbon di pt molindo inti gas menggunakan metode fuzzy inference system
Author
Kurniawati, Mia Dewi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010901/IND/2005
Subject(s)
PRODUCTION MANAGEMENT
QUALITY CONTROL
Notes
Appendix: p. 72 - 155
Bibliography: p. 71
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 155 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01577/05
(T) - 658.562 Kur P
Library - 8th Floor
Available
Similar Collection
by author or subject
Upaya menurunkan tingkat kecacatan proses casting di PT Makmur Sehati dengan metode eksperimen desain
Operations management for competitive advantage
Klasifikasi inventori dengan ABC/XYZ analysis dan mengoptimalkan safety stock di PT. X
Quality management
Kajian total quality education: Pengukuran kinerja dengan pendekatan QFD (quality function deployment)
Pengukuran dan pengendalian biaya kualitas dalam rangka peningkatan efisiensi biaya produksi pada PT Kawan Setia di Gresik
Upaya pencapaian target kapasitas produksi di line assembling western divisi gas PT Nayati Indonesia
Perbaikan sistem pengendalian kualitas pada divisi karet di PT. HRL International