Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa penyebab utama change order pada proyek konstruksi gedung t Universitas Kristen Petra Surabaya
Author
Eriana, Joice
Additional Author(s)
Wijaya, Peter Kurnia
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121396/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 65 - 105
Bibliography: p. 63 - 64
Abstract
-
Physical Dimension
Number of Page(s)
xix, 105 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00769/05
(T) - 658.404 Eri A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa penyebab utama change order pada proyek konstruksi gedung t universitas kristen petra Surabaya
Analisis pengaruh variabel sikap, keahlian dan pengetahuan terhadap kompentensi manajemen perusahaan konstruksi dari sudut pandang owner, konsultan dan sub kontraktor...
Studi kelayakan proyek industri
Project management
Perancangan sistem perpustakaan audio-visual dokumenter dan evaluasi kelayakannya
Sistem administrasi shop drawing
Pengukuran kualitas pekerjaan finishing pada suatu proyek konstruksi di Surabaya
Project management