Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penerapan dan pemberian milestone pada metode earned schedule untuk pengendalian penjadwalan pada beberapa proyek
Author
Lumanto, Hanny Sampurna
Additional Author(s)
Sutjiadi, James Thomas
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2019
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012304/SIP/2019
Subject(s)
FORECASTING
MILESTONES
PROJECT MANAGEMENT
Notes
. Bibliography: p. 73.
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 73 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01231/19
(T) SIP 21-2304 P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi elemen-elemen penghambat dalam penerapan ISO 9002 pada perusahaan konstruksi serta upaya penanggulangannya
Studi kasus pengukuran produktivitas pekerjaan pemancangan pada proyek x dan faktor-faktor yang mempengaruhinya
Analisa penggembangan produk properti berdasarkan aspek non finansial dan aspek finansial
Current techniques in architectural practice
Monitoring jadwal suatu proyek sekolah dengan menggunakan metode SPI dan PPC
Analisis pemilihan kontaktor dalam mencapai kinerja proyek
Engineering construction risks
Studi kasus analisis rumah tumbuh di jalan raya pakal dilihat dari aspek pemasaran dan keuangan