Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Identifikasi keterlambatan pengiriman produk departemen produksi extrussion blow molding di PT X Surabaya
Author
Oktapia, Alvenia
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022155/IND/2018
Subject(s)
INDUSTRIAL MANAGEMENT
PRODUCTION PLANNING
Notes
. Bibliography: p. 60.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 60 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03331/18
(T) IND 01-2155
Library - 8th Floor
Available
Similar Collection
by author or subject
Perencanaan kebutuhan bahan baku di PT Jaya Makmur
Penjadwalan produksi untuk meminimumkan setup time dan memaksimumkan aliran uang dengan metode genetic algorithm studi kasus pada CV. WP
Business policy
Perancangan sistem pengukuran kinerja dengan metode integrated performance measurement systems di PT. Cahaya Angkasa Abadi
Tea house
Perencaaan kebutuhan kertas, grain dan lem resin untuk produk amplas H231 di PT Norton Hamplas Industries
Management control systems
Manajemen keuangan