Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penerapan metode time impact analysis pada sebuah proyek bangunan gedung bertingkat di Surabaya
Author
Tjanlisan, Yonri
Additional Author(s)
Cuntoro, Rivan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012229/SIP/2018
Subject(s)
CONTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 52-53
. Bibliography: p. 51 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 53 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01781/18
(T) SIP 2229
Library - 8th Floor
Available
Similar Collection
by author or subject
Studi kasus penerapan schedule assessment pada penjadwalan proyek salah satu gedung bertingkat di Surabaya
Construction extension to the PMBOK guide third edition
Perbandingan resource leveling dengan menggunakan aplikasi program microsoft project 2010 dan primavera
Penjadwalan proyek konstruksi
Project management
IT project portfolio management
Survei awal kesiapan kontraktor di Surabaya dalam menerapkan "Time Impact Analysis"
Studi awal penerapan teory fuzzy set dalam memilih kontraktor pemenang tender