Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi metode quick changeover untuk meminimalkan waktu setup di P.T.Z
Author
Suwandi, Daniel Ahendra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Teknik Mesin Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01011226/MES/2018
Subject(s)
ASSEMBLY-LINE METHODS
MANUFACTURING PROCESS
Notes
Appendix: p. 36-38
. Bibliography: p. 35.
Abstract
-
Physical Dimension
Number of Page(s)
vi, 38 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00873/18
(T) MES 1226
Library - 8th Floor
Available
Similar Collection
by author or subject
LKP : di PT Panggung Electronic Industries Surabaya
Pengurangan waktu pengecekan process control inspection QC patrol dengan metode lean manufacturing di PT. FSCM Manufacturing Indonesia
Pembuatan sistem penghitungan Overall Equipment Effectiveness (OEE), pendataan downtime dan penerapan quick changeover untuk meningkatkan produktifitas di PT. Z
Penentuan parameter menggunakan kernel estimator untuk menghitung capability index
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia
LKP : di PT IONUDA
Quick changeover for operator