Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan leadtime proses pengiriman ekspor barang dengan penggunaan value stream mapping pada divisi sales OEM di PT. X
Author
Lengkong, Ryan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021872/IND/2016
Subject(s)
TIME MANAGEMENT
WORK MEASUREMENT
WASTE MANAGEMENT INDUSTRY
Notes
Appendix: p. 64-77
. Bibliography: p. 63.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 77 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01004/16
(T) IND 1872
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Classic Prima Carpets Industries Surabaya
Pengukuran performa penelitian, publikasi, dan pengabdian pada masyarakat di fakultas dengan metode integrasi dea-ahp
Upaya peningkatan output produksi pada faisilitas kerja departemen preparation di PT. Integra Indocabinet
Peningkatan yield departemen XYZ pada PT X
Penyusunan balance scorecard pada 'PT Tirta Maju Bahagia'
Penerapan value stream mapping untuk allocation planning di PT. X
LKP : NV The Kenarie Soy Manufactory
Work systems and the methods, measurement, and management of work