Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan leadtime proses pengiriman ekspor barang dengan penggunaan value stream mapping pada divisi sales OEM di PT. X
Author
Lengkong, Ryan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021872/IND/2016
Subject(s)
TIME MANAGEMENT
WORK MEASUREMENT
WASTE MANAGEMENT INDUSTRY
Notes
Appendix: p. 64-77
. Bibliography: p. 63.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 77 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01004/16
(T) IND 1872
-
Unavailable : Removed
Similar Collection
by author or subject
Pembandingan aplikasi metode penjadualan di perusahaan koper
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya
Perencanaan produksi perusahaan sepeda
Perencanaan kebutuhan material sabun di PT Megasurya Mas
Peningkatan konsistensi data dan pengurangan waktu kerja sistem penilaian mesin dan karyawan di PT. XYZ
Studi kasus perencanaan alokasi kebutuhan tenaga kerja pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Analisa hubungan antara size, product life cycle, dan market position dengan penggunaan balanced scorecard pada sektor perbankan dan asuransi di Surabaya