Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi produktivitas kerja struktur kolom, balok dan plat di proyek Tunjungan Plaza 6
Author
Benaya A.S.T.
Additional Author(s)
Saputra, Andrew Darma
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012077/SIP/2015
Subject(s)
BUILDINGS, REINFORCED CONCRETE
TALL BUILDING-DESIGN AND CONSTRUCTION
CONSTRUCTION INDUSTRY-MANAGEMENT
COLUMNS
Notes
Appendix: p. 46-159
. Bibliography: p. 45.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 159 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00525/16
(T) SIP 2077
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Construction scheduling with primavera project planner
Evaluasi apartemen High Point dari aspek finansial
Project evaluation and procurement case studies
Hubungan antara taktik dan hasil negosiasi dalam penyelesaian sengketa jasa konstruksi
Studi kasus faktor-faktor yang dapat meningkatkan kualitas sdm sebagai modal dasar untuk menciptakan suatu perusahaan yang sehat
Construction project scheduling and control
Analisa konfik dalam perusahaan kontraktor
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi