Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Author
Halim, Cristian
Additional Author(s)
Maria S.D., Maximillian
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012043/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-COSTS
REINFORCED CONCRETE STRUCTURES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 160.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 160 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02645/15
(T) SIP 2043
-
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi kriteria-kriteria prakualifikasi kontraktor serta peringkatnya terhadap kualifiksi kontraktor dalam memenuhi target proyek waktu, biaya, kualitas, keselamatan kerja
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang
Hubungan antara time overruns dan kepuasan konsumen menurut pendapat kontraktor dan pengembang pada proyek perumahan
Sistem informasi manajemen untuk pengendalian biaya proyek PT. "ABC" pada proyek "X"
Analisa keterlambatan pada proyek bangunan gedung bertingkat di Surabaya dengan metode window delay analysis
Studi tentang upah dan upah lembur tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Studi tentang faktor-faktor yang menentukan besarnya mark up dalam penerapan teori utilitias pada penawaran konstruksi fisik di Surabaya
Inspeksi pelaksanaan bekisting pada proyek konstruksi X