Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Author
Halim, Cristian
Additional Author(s)
Maria S.D., Maximillian
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012043/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-COSTS
REINFORCED CONCRETE STRUCTURES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 160.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 160 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02645/15
(T) SIP 2043
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis hubungan antara tingkat tindakan tidak aman dan keefektifan pekerja pada proyek
Analisis ekonomis sebagai dasar pengambilan keputusan dalam penggantian excavator
Survei penerapan konsep sustainable construction di negara berkembang dan kemungkinan penerapannya di Indonesia
Program desain perkuatan kolom dengan menggunakan FRP confinement sesuai ACI 440.2R-17
Construction management
Manajemen proyek konstruksi
Impacts of managerial and operational problems on facility layout arrangement in multi products precasting yards
Program p3-tc untuk perhitungan waktu efektif penggunaan tower crane pada konstruksi bangunan bertingkat