Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan estimasi loading bagian machinery PT. X
Author
Rahardjo, Mikhael Ariesto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021802/IND/2015
Subject(s)
MACHINERY IN INDUSTRY
PRODUCTION PLANNING
PRODUCTION MANAGEMENT
Notes
Appendix: p. 74-88
. Bibliography: p. 73.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 88 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02397/15
(T) IND 1802
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan quality plan di PT Sandang Anggun Moratex
Lean performance erp project management
LKP : perencanaan persediaan bahan di PT Sumber Makmur Perkasa
Perancangan form audit dan instruksi penerapan 5S di divisi research and development CV Sinar Baja Electric
Analisis fungsi manajemen operasional di PT So Good Wonoayu Sidoarjo
Perencanaan produksi di perusahaan "xxx"
Perancangan sistem perencanaan dan penjadwalan produksi di cv. Toyobo
Organizational structure and job description development in work study department and case study in packing department at PT. Doulton