Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya peningkatan output aktual di line 2 finishing PT. Integra Indocabinet
Author
Chandra, Anthony
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021784/IND/2014
Subject(s)
PRODUCTION CAPACITY
PRODUCTION MANAGEMENT
Notes
Appendix: p. 60 - 98
. Bibliography: p. 59.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 98 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00898/15
(T) IND 1784
-
Unavailable : Removed
Similar Collection
by author or subject
Business process improvement workbook
Operation management
Characteristics of modern production
Penyusunan Hazard Analysis Critical Control Point (HACCP) produk sosis di PT Aromaduta Rasaprima
Pengendalian persediaan dengan menggunakan sistem material requirements planning untuk meminimalkan persediaan bahan baku pada PT. Tunggal djaja indah
Manajemen produksi
Perencanaan produksi rangka sepeda di Classic Putra Jaya
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam