Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan kapasitas produksi melalui penghitungan waktu baku, tata letak fasilitas, serta pemberian kompensasi di PT Surya Putra Barutama
Author
Wijaya, Chandra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021723/IND/2014
Subject(s)
PLANT LAY OUT
PRODUCTION ENGINEERING
TIME MANAGEMENT
Notes
Appendix: p. 54 - 74
. Bibliography: p. 53.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 74 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01431/14
(T) 658.23 Wij P
-
Unavailable : Removed
Similar Collection
by author or subject
Manajemen waktu untuk diri sendiri
Tata letak pabrik dan pemindahan bahan
Perbaikan sistem dokumentasi pada departemen quality assurance di PT FSCM Manufacturing Indonesia Plant 4
Advances in fire and process safety
Analisa down time produksi dan kontaminasi bahan di PT. X
Engineering for the control of manufacturing
Engineering manufacturing processes in machine and assembly shops
LKP : PT Ganda Wangsa Utama