Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Tata letak pabrik dan pemindahan bahan ed. 2, cet. 2
Author
Wignjosoebroto, Sritomo
Additional Author(s)
-
Publisher
Jakarta: Penerbit Guna Widya, 1992
Language
Indonesian
ISBN
9795450018
Series
-
Subject(s)
PRODUCTION ENGINEERING
MATERIALS HANDLING
PLANT LAYOUT
Notes
Bibliography: p. 225
Abstract
-
Physical Dimension
Number of Page(s)
xii, 225p.
Dimension
23 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00705/10
658.23 Wig T
Library - 7th Floor
Available
Similar Collection
by author or subject
Diktat teknik tata cara dan pengukuran waktu kerja
Pengantar teknik dan manajemen industri
Ergonomi studi gerak dan waktu
Tata letak pabrik dan pemindahan bahan
Pendekatan hybrid genetic algorithm pada penjadwalan produksi di PT. Alas Petala Makmur
Concurrent engineering
Peningkatan kapasitas produksi pada SM-6 line melalui implementasi kaizen di PT Schneider Electric Indonesia LTD.
Service orientation in holonic and multi-agent manufacturing