Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus produktivitas pekerjaan produksi dan pemasangan dinding precast pada proyek apartemen
Author
Salim, Andree Surya
Additional Author(s)
Kaswara, Kulito
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011936/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 48 - 55
. Bibliography: p. 47 .
Abstract
-
Physical Dimension
Number of Page(s)
xv, 55 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01377/14
(T) 690.068 Sal S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh penggunaan kombinasi viscosity modifying admixtures dan superplasticizer terhadap rheologi mortar dan beton self compacting concrete
Penanganan sisa material ready-mixed concrete pada proyek konstruksi
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Analisa life cycle cost pada gedung manajemen perhotelan Universitas Kristen Petra
Construction management
Pemodelan quality culture dan organizational climate pada perusahaan kontraktor
Keselamatan kerja dan asuransi kecelakaan kerja pada proyek konstruksi