Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi stock preparation 5 & 7 PT. Suparma Tbk
Author
Septianti, Rika
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02040815/IND/2004
Subject(s)
PERSONNEL MANAGEMENT
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 194 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02868/04
(T) 658.542 Sep P
Library - 8th Floor
Available
Similar Collection
by author or subject
Pengaruh pemberian motivasi terhdap prestasi kerja karyawan departement housekeeping di hotel Oasis Benoa, Bali
Pengaruh frekuensi dan intensitas komunikasi upline ke downline terhadap produktivitas kerja downline di PT. Orindo Alam Ayu (oriflame) Surabaya
'Perancangan human resource scorecard dalam pengelolaan sumber daya manusia pada PT. Melody Asri'
Pentingnya kedisiplinan kerja karyawan bagian produksi dalam peningkatan produktivitas perusahaan pada pabrik rokok PT. Penamas Nusaprima Malang
Jenis-jenis kompensasi untuk jurnalis perempuan: studi deskriptif pada harian jawa pos di Surabaya
Analisis deskriptif rekrutmen dan seleksi karyawan pada PT. Jatim Sentra Utama Surabaya
Pengaruh gaya kepemimpinan dan kompensasi terhadap kinerja karyawan pada PT. Artha Karisma
Pengaruh kompensasi dan disiplin kerja terhadap kinerja karyawan pada PT. Modern Widya Tehnical cabang Surabaya