Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya peningkatan kinerja UPPK Petra menggunakan referensi balanced score
Author
Ardianto, Edwin
Additional Author(s)
Chrisiana, Wanda
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/O689/IND/2003
Subject(s)
WORK MEASUREMENT
WORK SAMPLING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 496 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01704/04
(T) 658.542 Ard U
-
Unavailable : Removed
Similar Collection
by author or subject
Studi pengukuran standar kinerja di sekretariat daerah pemerintah kota Surabaya dengan kriteria MBNQA modifikasi
Analisa keseimbangan lintasan dan pengaruhnya terhadap tata letak pabrik pada pabrik kayu
Pengukuran produktivitas kerja karyawan di pabrik kecap cap ratu di Mojokerto
Analisis faktor penyebab target tidak tercapai di PT Spindo 1 unit slitter 3 dan potong plat 2
Perancangan standar kerja untuk mengurangi lead time pengiriman dengan menggunakan metode value stream mapping di PT. Samando
Upaya pencapaian target output mesin injeksi 7 dan penempatan material finishing pada storage area di PT. X
LKP : PT. Makmur Jaya Kharisma
Analisa hubungan antara size, product life cycle, dan market position dengan penggunaan balanced scorecard pada sektor industri restoran