Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Author
Margono, Budi
Additional Author(s)
Sianturi, Martua Raja
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1320/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01604/04
(T) 690.068 Mar A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Optimasi construction site layout menggunakan metode metahueristic algorithm pada proyek great hotel Diponegoro
Perbandingan resource leveling dengan menggunakan aplikasi program microsoft project 2010 dan primavera
Analisa spesifikasi rumah tipe 36 dalam rangka penurunan harga rumah pada Kompleks Citra Fajar Golf
Strategi sumber daya manusia untuk pekerja konstruksi (staf teknik)
Faktor-faktor yang mempengaruhi kinerja (performance) sumber daya manusia di tingkat menengah (mid level) manajemen pada perusahaan jasa konstruksi di Surabaya
Penyiapan bar bending schedule untuk proyek konstruksi
Key Performance indicators (KPIs) yang digunakan untuk mengukur kesuksesan proyek konstruksi
Construction scheduling