Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Author
Margono, Budi
Additional Author(s)
Sianturi, Martua Raja
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1320/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01604/04
(T) 690.068 Mar A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kasus pengukuran produktivitas pekerjaan pemancangan pada proyek x dan faktor-faktor yang mempengaruhinya
Perancangan sistem informasi manajemen sumber daya manusia perusahaan kontraktor (studi kasus di P.T. "X")
Faktor-faktor yang mempengaruhi pemeliharaan ditinjau dari pengorganisasian tenaga kerja dan biaya pemeliharaan apartemen dan kondominium
Analisa quantity take-off dengan menggunakan autodesk revit
Studi literatur tentang constructability dalam proyek konstruksi
Construction project scheduling and control
Potensi penerapan lean construction pada proyek konstruksi di Surabaya
Faktor tidak selesainya pekerjaan pada proyek konstruksi