Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Optimasi pemenuhan order di divisi NCR CV. Dirgahayu
Author
Desiani, Ika
Additional Author(s)
Palembangan, Aris
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0677/IND/2003
Subject(s)
INVENTORY CONTROL
MATERIAL REQUIREMENTS PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 141 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01145/04
(T) 658.787 Des O
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa pengendalian persediaan bahan baku pada perusahaan pengecoran timah PT Noor Sakti Utama di desa Gedangan Sidoarjo
Perencanaan dan pengendalian persediaan bahan baku pipa lonjor di PT Welling Jaya Sejati Industrial
Analisa perluasan departemen material di PT. "A"
Analisa Penggunaan bahan baku filamen, faktor penyebab delay mesin lead in wire dan pembuatan rancangan sistem PPIC di PT. Cahaya Angkasa abadi sidoarjo
Analisa pengendalian persediaan bahan baku pada PT Kuda Emas Indah, Kediri
Pengendalian persediaan bahan baku untuk melancarkan kegiatan produkso pada PT "Prodenta Indonesia" Surabaya
Inventory control di PT. XYZ
Perancangan produksi dan pengendalian persediaan di UD. Kompas