Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan perawatan mesin-mesin produksi pada unit 2A (televisi) di PT. Panggung Electric Corporation
Author
Tandean, Fenny
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0684/IND/2003
Subject(s)
INDUSTRIAL EQUIPMENT--MAINTENANCE AND REPAIR
MACHINERY-MAINTENANCE AND REPAIR
PLANT ENGINEERING
PLANT MAINTENANCE
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xv, 112 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04217/03
(T) 658.202 Tan P
-
Unavailable : Removed
Similar Collection
by author or subject
Orchid mechanical parts a pilot project for tooling monitoring system at PT Schneider Electric manufacturing Batam
Penentuan keputusan perawatan forklift pada area finish good PT Charoen Pokphand Feedmill Balaraja
Upaya peningkatan sistem maintenance di departemen one way packaging PT. SS
Perencanaan penerapan reability centered maintenace (RCM) di PT. Kertarajasa Raya
Perencanaan penjadwalan perawatan mesin di PT. Sari Mas Permai
Pembuatan maintenance mastership untuk peningkatan kualitas maintenance mesin-mesin produksi dan analisa penyebab cacat pada bearing after dryer force fan di PT. X
Minimalisasi kegagalan sirkulasi pengembalian feed pada mesin pellet di PT. Charoen Pokphand Indonesia Feedmill
Perbaikan sistem maintenance di PT. X