Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT ACE Metal Indonesia Surabaya
Author
Purnomo, Handri
Additional Author(s)
Setyawan, Iwan
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek I no. 98.1.018
Subject(s)
MANUFACTURING PROCESSES
METAL INDUSTRY AND TRADE
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
v, 31 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01928/99
L 621.8 Pur L-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Perencaan mesin press plat untuk pembentukan diding box pada mobil pick-up dengan sistem hidrolik
Introduction to manufacturing processes
Diskriminasi struktur proses produksi dalam domain frekuensi dengan menggunakan transformasi fast fourier serta prngujian kolmogorof smirnov
Analisis penyebab internal keterlambatan delivery order di PT 'X'
Penerapan petri nets dalam penjadualan dan optimasi dengan simulated annealing di PT 'X'
Analisa produktivitas tenaga kerja di pt x
LKP : PT Srikaya Putra Mas Sidoarjo
LKP : penghitungan waktu baku dan efisiensi operator di PT Wonojati Wijoyo