Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Sentrabumi Palapa Utama Surabaya
Author
Aurelia H., Vike
Additional Author(s)
Tan, Leny
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II no. 98.2.16
Subject(s)
AUTOMOBILES-BODIES-INDUSTRY
PRODUCTION ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
v, 30 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01925/99
L 621.8 Aur L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Analisis sistem quality control pada CV. Gema Sutera
Pengidentifikasian waste melalui value stream mapping dan upaya pengurangan waste pada Departemen PK PT X
Peranan sistem dan prosedur pembelian bahan baku dalam usaha mencapai pengendalian intern yang memadai pada PT. "X" di Surabaya
Minimalisasi bahan baku yang terbuang melalui corong mesin mixer di PT. Charoen Pokphand Indonesia Feedmill Balaraja
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
LKP: analisa 4P (product, price, place, promotion) hotel Satelit Surabaya, jln. Mayjen Sungkono 139 Surabaya
Studi kelayakan perluasan perusahaan plastik Sumber Mulya Putra
Perbandingan sistem mutu oleh china quality certification (cqc) dengan iso 9001:2000 di PT E-T-A Indonesia