Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : perencanaan kebutuhan material dengan metode lot for lot
Author
Nugroho, Septiliana
Additional Author(s)
-
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek manajemen
Subject(s)
INVENTORY CONTROL
MATERIALS-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
x, 38 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06376/98
L 670.42 Nug L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP : PT Gatra Mapan Jl. Tunjung Tirto1, Karanglo-Malang
Perbandingan metode pengendalian proses dengan menggunakan peta kendali X dan M, R dan s
Production planning and inventory control
LKP : analisa pengendalian persediaan peralatan medis di Rumah Sakit Adi Husada
Upaya pengendalian inventori gudang produk jadi di PT. X
Pentingnya pengendalian persediaan bahan baku di PT "X"
Usulan penentuan rute pengiriman barang di PT Aries Centaurus pada kasus vehicle routing problem with time windows dengan alogaritma tabu search
Perancangan sistem perencanaan produksi dan pengendalian persediaan bahan baku di pt. sarana graha ideal