Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi listrik di PT Surya Sakti Utama Surabaya
Author
Hitong, Albertus Fredrik
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 60 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00184/98
L 621.3 Hit L/E-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Studi tentang pengoperasian turbo generator 300 MW di PLTU Gresik
LKP : generator dan pembangkit listrik Shangri-La Hotel Surabaya
Evaluasi pengaruh faktor daya terhadap konsumsi daya listrik di pt. semen gresik tuban III
Perencanaan saluran udara tegangan tinggi (SUTT) 150 KV Gilimanuk-Pemaron dalam rangka perbaikan sistem transmisi listrik di Bali
LKP : Analisa instalasi tenaga listrik di pt. eta Indonesia (lantai 2)
Analisis faktor daya terhadap pengukuran KWH meter pada beban tidak seimbang di GI Sukolilo
Transmisi tenaga listrik
Pemrograman analisa stabilitas sistem tenaga listrik dan penerapannya pada sistem 150 KV di Jawa Timur