Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi listrik di PT Surya Sakti Utama Surabaya
Author
Hitong, Albertus Fredrik
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 60 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00184/98
L 621.3 Hit L/E-II
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP : generator dan pembangkit listrik Shangri-La Hotel Surabaya
Studi tentang pengoperasian turbo generator 300 MW di PLTU Gresik
Studi perbandingan penggunaan energi listrik antara suplai listrik dan generator set di PT. Industri Sandang Nusantara unit II Lawang
Evaluasi perancangan auxiliary equipments untuk pltu 25 mw di pt. adiprima suraprinta Gresik
Studi penentuan service area penyulang-penyulang dari GI Rungkut dengan batasan sistim radial interkoneksi menggunakan peta digital dengan autocad 2002 pada PLN UJ Rungkut APJ Surabaya Selatan
Electric power distribution systems engineering
Studi tentang kualitas daya di gedung p Universitas Kristen Petra
LKP : distribusi dan instalasi tenaga listrik dengan daya 2 MVA di PT Siantar Top Waru-Sidoarjo