Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : sistem pembangkitan di Mercure Grand Hotel Surabaya
Author
Sucahyo, Dennie
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris I
Subject(s)
DIESEL ELECTRIC POWER-PLANTS
ELECTRIC GENERATORS
ELECTRIC POWER-PLANTS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 40 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00146/98
L 621.3 Suc L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Kontrol otomatis sistem listrik standby dan amergency pada satu genset 35 KVA, 380 V, 50 Hz, 3 phasa dengan menggunakan mikrocontroller 8031
LKP: Pembuatan panel sinkron mannual 1000 KVA di Conductama Jerindo, P.T. Surabaya
Rancang bangun dan pengoperasian PLTD 2x15, 495 MVA di Bali
LKP : PT ITP Bogasari Flour Mills division Surabaya
Perancangan sistem konverter dari bahan bakar bensin menjadi gas hidrogen untuk membangkitkan generator listrik
Studi suplai listrik dengan sistem pembangkit hibrida yang terdiri dari solar photovoltaic, wind turbine generator, diesel engine generator 200 KWH/hari tegangan 220 volt AC di Nusa Penida
Modern power plant engineering
Studi tentang pmg dalam sistem aksitasi generator set daya 600 KVA di PT. Conductama Jerbindo