Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : sistem pembangkitan di Mercure Grand Hotel Surabaya
Author
Sucahyo, Dennie
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris I
Subject(s)
DIESEL ELECTRIC POWER-PLANTS
ELECTRIC GENERATORS
ELECTRIC POWER-PLANTS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 40 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00146/98
L 621.3 Suc L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP: Pembuatan panel sinkron mannual 1000 KVA di Conductama Jerindo, P.T. Surabaya
Kontrol otomatis sistem listrik standby dan amergency pada satu genset 35 KVA, 380 V, 50 Hz, 3 phasa dengan menggunakan mikrocontroller 8031
LKP : pembangkit listrik gedung fakultas teknik Universitas Kristen Petra Surabaya
Analisa tekno-ekonomis dari simulasi pemanfaatan pembangkit hybrid micro off grid wind turbine-photovoltaic
Power generation retrofitting
LKP : PT Classic Prima Carpets Surabaya
Studi teknis pengoperasian diesel genset (PLTD) 3000 KVA di PT. Kayan River Indah Plywood, Sumber Mas Group Samarinda
Studi operasi dan kontrol dari tiga pembangkit di PT. Sasa Inti, Gending, Probolinggo