Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi tenaga listrik dengan daya 2 MVA di PT Siantar Top Waru-Sidoarjo
Author
Suwandi
Additional Author(s)
-
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris I
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 114 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00106/98
L 621.3 Suw L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP: generator dan pembangkit dengan daya 1 MVA di CV. Korin Inti Wira Engineering Surabaya
Studi tentang sistem otomasi pada proses pembuatan mie instant di PT. Siantar Top, Tbk.
Hotel dan apartement di Karet Kuningan Jakarta
Graha werda di Jakarta
Studi tentang supply listrik di gedung Petra dan aspek ekonomisnya
Studi tentang kualitas daya di gedung p Universitas Kristen Petra
Studi sistem instalasi listrik 1,6 mva di PT. Gramitrama battery industry
LKP : instalasi tenaga listrik di PT Kualimas Aditama Sidoarjo