Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi tenaga listrik di PT Gudang Garam Surabaya
Author
Halim, Helen Chiauwati
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek Elektrik I
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 264 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00062/98
L 621.3 Hal L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Studi kualitas daya listrik di Rumah Sakit Adi Husada Surabaya
LKP: Pembangkit tenaga listrik di New Grand Park Hotel Surabaya
Studi Pemeliharaan pada jaringan bertegangan 20 KV dengan metode berjarak di PT. PLN PERSERO unit bisnis distribusi Jawa Timur UPJ Area Gresik
Studi perbandingan penggunaan energi listrik antara suplai listrik dan generator set di PT. Industri Sandang Nusantara unit II Lawang
Studi over current relay gangguan tiga fasa penyulang bilka 20 kv di gardu induk Ngagel
Studi gangguan satu phasa ke tanah jaringan sutm 2 kv yang berdampak pada PLTD sebagai catu daya dii pulau Bawean PT. PLN (Persero) UPJ area Gresik
LKP : PT Schneider Indonesia untuk Proyek Bunas Tower Surabaya
Analisa desain lampu, AC, dan sumber daya listrik di GKJW jemaat Rungkut