Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi tenaga listrik di PT Gudang Garam Surabaya
Author
Halim, Helen Chiauwati
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek Elektrik I
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 264 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00062/98
L 621.3 Hal L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP: Pembangkit tenaga listrik di New Grand Park Hotel Surabaya
Studi kualitas daya listrik di Rumah Sakit Adi Husada Surabaya
Studi pemasangan reaktor shunt pada gardu induk Krian
Studi tentang power supply untuk hotel-hotel bertingkat (sembilan tingkat atau lebih) di Surabaya
Studi harmonisa egangan dan arus di gedung A Universitas Kristen Petra
Evaluasi perancangan auxiliary equipments untuk pltu 25 mw di pt. adiprima suraprinta Gresik
Analisa instalasi listrik plant 2 di PT Bumi Menara Internusa Surabaya
Power quality in electrical systems