Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : perencanaan dan pembuatan torsi meter untuk motor dengan daya 3 KW di Laboratorium Sistem Tenaga Listrik Universitas Kristen Petra
Author
Hartanto, Adi
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektrik II
Subject(s)
ELECTRIC GENERATORS
ELECTRIC MOTORS, INDUCTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
55 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00022/98
L 621.3 Har L/E-II
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP : penggunaan motor-motor listrik pada pabrik sabun di PT Filma Utama Soap Surabaya
Perencanaan dan pembuatan motor induksi rotor sangkar 3 phasa, 3 HP dengan 2 kecepatan sinkron 1500 RPM dan 3000 RPM
Perancangan sistem konverter dari bahan bakar bensin menjadi gas hidrogen untuk membangkitkan generator listrik
Studi suplai listrik dengan sistem pembangkit hibrida yang terdiri dari solar photovoltaic, wind turbine generator, diesel engine generator 200 KWH/hari tegangan 220 volt AC di Nusa Penida
Studi tentang pembagian beban pada generator set (2 x 1,25 mva) di Tunjungan Plaza II
LKP : CV Sumber Baru Semarang
Perencanaan dan pembuatan active load balancing unit pada generator 3 fase, 220/380 V, 25 KVA, beban dibatasi 5 KW, unit diparalel dengan PLN
Study banding karakteristik self excited dan permanent magnet generator (PMG) yang diaplikasikan untuk generator 100 KVA dan 250 KVA