Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Zindomas Surabaya
Author
Santoso, Budi
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi
Subject(s)
MANUFACTURING PROCESSES
PRODUCTION ENGINEERING-ANALYSIS DATA
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vi, 33 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02300/97
L 670.42 San L-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Pemanfaatan serat ijuk sebagai material campuran dalam beton untuk meningkatkan kemampuan beton menahan beban taruk
Perencanaan dan pembuatan daya nyata (KWH meter), untuk tegangan 220/380 volt, arus 6 ampere, 3 phasa untuk industri dengan menggunakan MCS-51
Kebiasaan membeli, menggunakan dan persepsi pembeli dan pengguna minyak goreng di Kelurahan Menur Pumpungan dan Semolowaru Surabaya
The confrotation between the flesh and the spirit as seen through John Buchanan and Alma Winemiller in Tennessee Williams's summer and smoke
LKP : di PT Ometraco Arya Samanta Surabaya
Manufacturing engineering and technology
LKP : di PT Sumber Urip Knalpot Malang
LKP : Perusahaan Mesin Aneka Mesin