Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : peramalan permintaan produk spring bed PT Indofibre Mattress
Author
Yulianty, Fransiska
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II; manajemen industri
Subject(s)
INVENTORY CONTROL
MANUFACTURING ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 75 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03557/96
L 670.42 Yul L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan sistem pengendalian persediaan bahan baku spring bed di PT Indofibre Mattress
LKP : PT Evata Eastern jln. Suningrat no. 17 Kecamatan Taman Sidoarjo
Organizational structure and job description development in work study department and case study in packing department at PT. Doulton
Menentukan kombinasi metode lot-sizing dan sequencing rules menggunakan simulasi study kasus di PT. Indofood Sukses Maknur, bogasari flour mills, Surabaya
Perancangan sistem PPIC di PT. Mustikarama Citraperdana
Modern production management
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam
Pengendalian mutu pada proses produksi lampit rotan di perusahaan X