Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : peramalan permintaan produk spring bed PT Indofibre Mattress
Author
Yulianty, Fransiska
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II; manajemen industri
Subject(s)
INVENTORY CONTROL
MANUFACTURING ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 75 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03557/96
L 670.42 Yul L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Evata Eastern jln. Suningrat no. 17 Kecamatan Taman Sidoarjo
Perancangan sistem pengendalian persediaan bahan baku spring bed di PT Indofibre Mattress
Dasar-dasar manajemen produksi dan operasi
Operations management
Perancangan sistem pergudangan pada gudang barang jadi PT XYZ
Peranan pengendalian persediaan bahan baku ditinjau dari segi penggunaan dana pada perusahaan PT United Waru Biscuit Manufacturing Sidoarjo
Strategi mempertahankan pelanggan melalui perbaikan supply chain management pada PT. XYZ
Pengendalian persediaan bahan baku dengan demand probabilistik di PT X