Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : CV Dwi Jaya
Author
Shintawati, Elly
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II; manajemen industri
Subject(s)
MANUFACTURING ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
v, 68 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03542/96
L 670.42 Shi L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan perusahaan aksesori mobil
Perencanaan perusahaan aksesori mobil
LKP : PT Rehoboth Design Centre
Upaya peningkatan output produksi pada faisilitas kerja departemen preparation di PT. Integra Indocabinet
Analisa Penggunaan bahan baku filamen, faktor penyebab delay mesin lead in wire dan pembuatan rancangan sistem PPIC di PT. Cahaya Angkasa abadi sidoarjo
Penyusunan prosedur departemen produksi dan departemen QSHE di PT Charoen Pokphand Indoneisa Balaraja Feed Processing
LKP: perusahaan kampas rem PT Benin Internasional Raya Desa Mangliawan Kec. Pakis Malang
Manajemen produksi