Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Ace Metal Indonesia
Author
Kurniawan, Mimi
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II; manajemen industri
Subject(s)
MANUFACTURING ENGINEERING
PLANT LAYOUT
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 80 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03541/96
L 670.42 Kur L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan dan pengembangan fasilitas kerja pada stasiun kerja filler dan boring PT Djajanti Universal, Gresik
LKP : PT Djajanti Universal Gresik
Pengendalian proses pada sistem manajemen mutu ISO 9000 (studi kasus pada PT. Tatamulia Nusantara Indah)
Analisa perencanaan dan pengawasan sistem produksi pada perusahaan manufaktur tas "X" di Surabaya
Management produksi
World-class manufacturing
Build-to-order and mass customization
Penerapan manajemen persediaan dengan metode material requirement planning untuk meningkatkan efisiensi biaya persediaan bahan baku pada perusahaan "X" di Jawa Timur