Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : UD Cipta Jaya
Author
Joice
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II; manajemen industri
Subject(s)
MANAGEMENT INFORMATION SYSTEMS
MANUFACTURING ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 40 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03535/96
L 670.42 Joi L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencaaan kebutuhan kertas, grain dan lem resin untuk produk amplas H231 di PT Norton Hamplas Industries
LKP : PT Waru Djaja Sidoarjo
Peningkatan penerapan 5S di divisi persiapan pengepakan PT X
Analisa loss produk dan pengendalian kualitasdi PT Sinar Sosro
Peningkatan produktivitas pada line final dan packing assembling 2 di PT Panggung Electric Corporation
Perancangan buffer size yang optimal dalam mengatasi MRP nervousness dengan memperhatikan tingkat inflasi
The leading practice of decision making in modern business systems
Penerapan sistem material requirements planning (MRP) sebagai alat untuk meningkatkan efisiensi biaya persediaan bahan baku pada PT. Siantarjaya Ekatama Surabaya