Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Susanti Megah
Author
Fenny
Additional Author(s)
-
Publisher
Surabaya: 1995
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek I: produksi
Subject(s)
QUALITY CONTROL
MANUFACTURING ENGINEERING
PRODUCTION PROCESSES
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 69 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03530/96
L 670.42 Fen L-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penelitian proses implementasi ISO 9000 pada industri manufaktur di Jawa Timur
LKP : PT Umbra Prasia
Studi kelayakan perluasan pabrik minuman teh botol "s" di PT X berdasarkan pertimbangan kapasitas produksi sekarang untuk mengantisipasi permintaan pasar
Upaya peningkatan pelayanan dan fasilitas transit bagi wisatawan asing selama di Surabaya
Perancangan standard operating procedure (departemen quality area, logistik engineering dan personnel and general affairs) di PT. X
Upaya peningkatan kualitas layanan di perusahaan asuransi Manulife Financial
LKP : PT Wangsa Manunggal Jaya perkasa
Diagnosability, security and safety of hybrid dynamic and cyber-physical systems