Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Ace Metal Indonesia
Author
Ong, Chelsia
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II; manajemen produksi
Subject(s)
MANUFACTURING ENGINEERING
PLANT LAYOUT
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 56 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03515/96
L 670.42 Ong L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kelayakan pembangunan Supermarket Sinar di daerah Pondok Tjandra
LKP : PT Djajanti Universal Gresik
Product strategy and management
Analisis proses transformasi dan konrol kualitas proses transformasi pada UD. Vialli
Customer-driven manufacturing
Industry 4.0 : Managing the Digital Transformation
Optimalisasi tata letak lantai produksi snc PT. SEMB PEM
LKP: perancangan sistem pengendalian persediaan di PT Dwi Sata Foam Jl. Simorejosari B3 Surabaya