Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Ace Metal Indonesia
Author
Ong, Chelsia
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II; manajemen produksi
Subject(s)
MANUFACTURING ENGINEERING
PLANT LAYOUT
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 56 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03515/96
L 670.42 Ong L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kelayakan pembangunan Supermarket Sinar di daerah Pondok Tjandra
LKP : PT Djajanti Universal Gresik
Dynamics in logistics
Perancangan sistem kanban pada line machining yoke di PT. Inti Ganda Perdana
Perancangan tata letak fasilitas dan sistem inventory untuk meningkatkan kapasitas produksi pada departemen Carpenter PT Trias Sentosa, Tbk
LKP: CV Golden Light Driyorejo 179 Gresik
LKP : PT Bobo Embroidery Surabaya
Perancangan jadwal maintenance dalam rangka aplikasi total productive maintenance (TPM) di PT Agrindo