Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Perkebunan XX (Persero) PG Kanigoro Madiun
Author
Lukito, Eko Budi
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC POWER PRODUCTION
ELECTRIC POWER-PLANTS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 53 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01729/96
L 621.3 Luk L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Surya Artha Graha Surabaya
Studi penggunaan capasitor tegangan tinggi 150 KV di gardu induk kapal Bali
LKP : PT Perkebunan XX (Persero) PG Kanigoro Madiun
Recycling of lithium-ion batteries
Studi operasi dan kontrol dari tiga pembangkit di PT. Sasa Inti, Gending, Probolinggo
Studi tentang pmg dalam sistem aksitasi generator set daya 600 KVA di PT. Conductama Jerbindo
LKP : pembangkit listrik gedung fakultas teknik Universitas Kristen Petra Surabaya
Designing impedance networks converters