Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT ITP Bogasari Flour Mills division Surabaya
Author
James
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan kerja elektris II
Subject(s)
DIESEL ELECTRIC POWER-PLANTS
ELECTRIC GENERATORS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 79 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01594/96
L 621.3 Jam L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Ometraco Arya Samanta Surabaya
LKP : PLTU sektor Gresik, Gresik
Studi gas turbin generator dan diesel generator yang dipakai sebagai sistem pembangkit listrik di KRI jenis mine hunter killer
Modern power station practice
Perencanaan dan pembuatan active load balancing unit pada generator 3 fase, 220/380 V, 25 KVA, beban dibatasi 5 KW, unit diparalel dengan PLN
LKP : Pabrik Gula Kedawung PTP XXIV-XXV Pasuruan
Studi tentang pmg dalam sistem aksitasi generator set daya 600 KVA di PT. Conductama Jerbindo
LKP : perencanaan dan pembuatan torsi meter untuk motor dengan daya 3 KW di Laboratorium Sistem Tenaga Listrik Universitas Kristen Petra