Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Boma Bisma Indra divisi diesel II Surabaya
Author
Anandya, Dudi
Additional Author(s)
-
Publisher
Surabaya: 1995
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek mekanis
Subject(s)
MACHINERY INDUSTRY
MANUFACTURING PROCESSES
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 51 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00309/96
L 621.3 Ana L/m
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : motor induksi di CV United Mesindo Surabaya
LKP : capacitor bank di PT Tambangkayu Cemerlang Sidoarjo
Perencanaan dan pembuatan sistem otomasi menyalakan dan mematikan supply listrik 3 fasa, 380/220, 3 X 10 A, dengan menggunakan PC dan PLC, serta saluran telepon sebagai sarana komunikasi
Improve metal shop process using lean six sigma at PT. Schneider Electric Indonesia
Perancangan sistem departemen PPC cat di PT. Interkraft
Manufacturing facilities design and material handling
LKP : PT Djajanti Universal Gresik
Optimalisasi utilitas mesin dan operator di PT. Aditama Raya Farmindo melalui pendekatan simulasi