Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Atlantic Biru Raya Ds. Sukerejo, Kabupaten Pasuruan
Author
Subiakto, Bambang
Additional Author(s)
-
Publisher
Surabaya: 1995
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC POWER SYSTEMS
MANUFACTURING PROCESSES
MINERAL WATER INDUSTRIES
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 55 p.
Dimension
30
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00307/96
L 621.3 Sub L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Konverter sumber tegangan 220 V satu fasa ke tiga fasa sebagai penggerak motor induksi tiga fasa 220/380 V, 1/3 HP, 2950 RPM
LKP : PT Duta Graha Indah Contractor Surabaya
Perancangan tata letak fasilitas di PT Solo Murni (kiky) dengan metode group technology
E-manufacture
LKP : perusahaan dan industri mesin Aneka Mesin Malang
Studi kualitas daya listrik 2180 kva di PT. Industri Sandang Nusantara unit patal lawang malang
Menurunkan tingkat arus harmonisa pada sistem tenaga listrik dengan filter pasif frekuensi tunggal
Fundamental manufacturing processes