Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT PLN (Persero) pembangkitan dan penyaluran Jawa Bagian Timur dan Bali Sektor Surabaya Transmisi Surabaya Timur Gardu Induk Rungkut
Author
Alexander, Boyke
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan Kerja Paktek Elektris II
Subject(s)
ELECTRIC POWER TRANSMISSION
ELECTRIC TRANSFORMERS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
x, 70 p.
Dimension
29
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01210/95
L 621.3 Ale L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Keberadaan kerja praktek di jurusan teknik elektro Universitas Kristen Petra
Perencanaan dan pembuatan perangkat soft start dengan fasilitas speed control untuk motor DC 12 V menggunakan mikrokontroler MCS-51
LKP : PT Surabaya Agung Industri PULP dan Kertas Surabaya
Analisa design pengembangan gardu induk (GI) 500 KV paiton dalam rangka interkoneksi Jawa-Bali
Studi kualitas daya listrik di gardu N 1 divisi niaga PT PAL Indonesia
Studi perbandingan penggunaan kabel laut tegangan tinggi 15kV dengan sutt 500kV/15kV untuk interkoneksi Jawa-Bali
Studi perbandingan pengaruh harmonisa tiga fasa yang menyebabkan ketidakseimbangan beban antara gardu trafo tiang 200 kVA dengan 160 kVA di PLN APJ Surabaya Utara
Studi penggunaan PLC untuk sistem pengaman bagi satu gardu induk yang dilengkapi transformator 150/20 KV khususnya untuk gardu induk Sukolilo