Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PLTU sektor Gresik, Gresik
Author
Kaware, Sonny
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek : Elektrik II
Subject(s)
ELECTRIC GENERATORS
ELECTRIC TRANSFORMERS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
93 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03648/94
L 621.3 Kaw L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Study tentang penggunaan negative sequence current filter untuk mengamankan generator 200 MW di PLTU Gresik Unit III
LKP : PT Kedawung Setia Waru Gunung
LKP : CV Pari Jaya Makmur Surabaya
Studi pemodelan dampak tegangan impuls pada transformator daya 150 kv di gardu induk
LKP : PT PLN (Persero) pembangkitan dan penyaluran Jawa Bagian Timur dan Bali Sektor Surabaya transmisi Surabaya Timur Gardu Induk Sukolilo
Single phase transformers and electrical machines VS CD
Studi tentang pembagian beban pada generator set (2 x 1,25 mva) di Tunjungan Plaza II
Analisis keandalan peningkatan kapasitas gardu induk (GI) dengan menggunakan pembangkit listrik tersebar (PLT) pada jaringan distribusi 20 kv