Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PLTU sektor Gresik, Gresik
Author
Kaware, Sonny
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek : Elektrik II
Subject(s)
ELECTRIC GENERATORS
ELECTRIC TRANSFORMERS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
93 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03648/94
L 621.3 Kaw L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Study tentang penggunaan negative sequence current filter untuk mengamankan generator 200 MW di PLTU Gresik Unit III
LKP : CV Pari Jaya Makmur Surabaya
LKP : PT Kedawung Setia Waru Gunung
LKP : elektris I P.T. Bismo Tunjungan Surabaya
Studi pengaruh harmonisa pada gardu trafo tiang dengan daya 100 kVA pada PLN UJ Rungkut APJ Surabaya Selatan
Menurunkan tingkat arus harmonisa pada beban tak linier 3x1 fasa dengan kombinasi beban tak linier 1x3 fasa dan zig-zag winding
LKP : perencanaan dan pembuatan torsi meter untuk motor dengan daya 3 KW di Laboratorium Sistem Tenaga Listrik Universitas Kristen Petra
LKP : PT Bambang Djaja Surabaya