Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Bayu Beringin Lestari Surabaya
Author
Wijono S, Joseph
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek : Elektrik II
Subject(s)
AIR CONDITIONING-ELECTRIC EQUIPMENT
ELECTRIC POWER SYSTEMS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vi, 37 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03129/94
L 621.3 Wij L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : CV Aneka Mesin Malang
LKP : Analisa instalasi tenaga listrik di pt. eta Indonesia (lantai 2)
Electrical transients in power systems
Power system stability
Electrical power systems
Studi over current relay gangguan tiga fasa penyulang bilka 20 kv di gardu induk Ngagel
Power system stability
LKP : PT Philips Ralin Electronics Surabaya