Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan line stop karena ketidaktersediaan bahan baku komponen di PT. Astra Otoparts Tbk. divisi Adiwira Plastik
Author
Setiawan, Benny
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021566/IND/2011
Subject(s)
INVENTORY CONTROL
RAW MATERIALS-MANAGEMENT
Notes
Appendix : p. 70 - 89
Bibliography : p. 69
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 89 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02121/12
(T) 658.787 Set P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan dan pembuatan situs e-commerce penjualan produk grosir pada UD. Sidomuncul di kota Kediri
Perancangan buku esai fotografi Belitung sebagai media promosi wisata
Perencanaan MRP di P.T. "X"
Perencanaan pengendalian persediaan bahan baku dengan memperhatikan kapasitas gudang di perusahaan sumber jaya
Peranan pengendalian persediaan bahan baku ditinjau dari segi penggunaan dana pada perusahaan PT United Waru Biscuit Manufacturing Sidoarjo
Perancangan supply chain management di CV Sanyu Paint Indonesia
Peningkatan inventory accuracy dengan meninjau ulang error handling report secara periodik di PT Schneider Electric Manufacturing Batam
Perancangan 5S store room di PT Charoen Pokphand Indonesia Balaraja, Tangerang